How many days does the general machine need to be installed before it can be used?

Most machines require 3-7 days to complete all installations. This mainly depends on the type and quantity of the machine. Our engineers will estimate the installation time according to your needs.

Related Products

After Sales Support

News

Grinding Media for Bead Mill | Zirconia Beads & Zirconium Silicate Beads

Bead mills mainly use grinding balls as media, and use impact, extrusion, and friction to achieve the final grinding effect, which mainly depends on the size and hardness of the grinding beads, the filling rate of the grinding beads, and the collision frequency adjustment between the grinding beads and the particles.

Overview of Laboratory Reactor

Laboratory reactors, also known as lab reactors, are essential tools in scientific research, product development, and process optimization. These reactors provide a controlled environment for conducting chemical reactions, mixing, dispersing, and homogenizing processes.

Ribbon Blender Mixer Equipment

A ribbon blender mixer, also known as a ribbon mixer or horizontal ribbon blender, is a powerful industrial machine designed for thorough and efficient blending of various materials.

Leave a Reply

Your email address will not be published. Required fields are marked *